Wear an ESD wrist strap and make sure it makes good skin contact and is well grounded. Then
unpack the dedicated SFP+ cable.
2.
Hold the connector at one end of the cable, with the pull latch on top.
3.
Orient the connector with the port and insert it into the port.
Removing a CX4/SFP+ cable
1.
Wear an ESD wrist strap and make sure it makes good skin contact and is well grounded.
2.
Hold the cable connector and pull the pull latch of the connector to remove the cable from the
switch.

Verifying the installation

After you complete the installation, verify that:
There is enough space for heat dissipation around the switch, and the rack or workbench is stable.
The grounding cable is securely connected.
The correct power source is used.
The power cords are correctly connected.
All the interface cables are cabled indoors. If any cable is routed outdoors, verify that the socket
strip with lightning protection has been correctly connected.