IRF fabric setup flowchart
Figure 56 IRF fabric setup flowchart
To set up an IRF fabric:
Step
1.
Plan IRF fabric setup
2.
Install IRF member switches
3.
Install the grounding cable, fan
tray, power modules, and power
cords
Description
Plan the installation site and IRF fabric setup parameters:
•
Planning IRF fabric size and the installation site
•
Identifying the master switch and planning IRF member IDs
•
Planning IRF topology and connections
•
Identifying physical IRF ports on the member switches
•
Planning the cabling scheme
See
"Installing the switch in a 19-inch
on a
workbench."
See
"Grounding the
switch,"
"Installing/removing a power
cord."
42
rack"or
"Mounting the switch
"Installing/removing a fan
module," and
"Connecting the power
tray,"