Processor Load Order; Required Tools; Rx2660 Processor Load Order - HP Integrity rx2660 User's & Service Manual

Hide thumbs Also See for Integrity rx2660:
Table of Contents

Advertisement

The server has one processor installed in slot Module 0 before shipping. Install the additional
processor in slot Module 1.
CAUTION:
Processor speed and cache size must be identical for all processors in a system. To ensure
compatibility whether upgrading, replacing, or adding an additional processor, use processors
with identical part numbers.
Failure to observe this caution results in performance degradation or system failure.
To ensure compatibility, use processors with identical part numbers.
CAUTION:
follow ESD safety precautions can result in damage to the server.

Processor Load Order

The server holds up to two single- or dual-core processors on the processor board. The slots on
the processor board are labeled Module 0 and Module 1. If the server has only one processor, it
is installed in slot Module 0. Install the second processor in slot Module 1.
Table 3-3
lists the processor load sequence.
Table 3-3 rx2660 Processor Load Order
Processor

Required Tools

To install processors, use the processor install tool fastened to the airflow guide.
TIP:
Prior to installing a processor into the server, read the following instructions carefully and
refer to the figures in this chapter for a complete understanding of this process.
To install a processor, follow these steps:
1.
Remove the top cover. See
2.
Remove the airflow guide. See
Intel Montvale processors cannot be intermixed with similar Montecito processors.
Observe all ESD safety precautions before attempting this procedure. Failure to
Slot
0
1
"Removing the Top Cover" (page 48)
Module 0
Module 1
"Removing the Airflow Guide" (page 49)
Installing Additional Components
53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents