Co Power Unit Installation - Paradyne WIRELESS DATA GATEWAY Installation And Operation Manual

Table of Contents

Advertisement

Install the Carrier
Use the following instructions to install a 3000 Series
Carrier.
Procedure
1. Attach the SDCP cable to the socket in the base of
the carrier, and feed it through the built-in retainer
clips. See Figure 3-2.
2. Bolt the carrier into the rack. This manual shows
the carriers mounted below the AAC, but this is
not a requirement.
Space
Between
CO Power
Power
Tray and
Tray
Power Module
3 0 0
0 D
C P
o w
SDCP
Ribbon
Cable
Power
Module
3981-A2-GN31-20
Built-in
Retainer
Clips
SDCP
Ribbon
Cable
CO
Flanges
e r
M o
d u le
3 0 0
0 D
C P
o w
e r
M o
d u le
Left
F an
Figure 3-2. CO Power Unit Installation
An unmounted carrier may
flex and damage installed
modem cards. Never install
cards in the carrier until the
carrier is mounted in a rack.
Remove all cards from the
carrier before removing a
carrier from a rack.
P ow
er
A la
rm
3 0 0
0 D
C P
o w
e r
M o
d u le
P ow
er
F an
A la
rm
November 1996
3000 Series Carrier Installation
CAUTION
Ground
Strap
496-13681-02
3-3

Advertisement

Table of Contents
loading

Table of Contents