5.3. Installation

Parameter
Temperature
Environmental class according to IEC
Air quality
Coastal, heavy industrial and farmer areas Must be measured and classified acc. to ISA S71.04-1985
Vibration
Ingress protection class
Max. operating altitude
Installation
Table 5.3: Conditions for Installation
Parameter
Wall Plate
Table 5.4: Wall Plate Specifications

5.4. Cable Requirements

Cable
AC
Outer diameter
Insulation strip
Max. recommended cable length
TripleLynx
8k and 10k
Max. recommended cable length
TripleLynx
12.5k
Max. recommended cable length
TripleLynx
15k
PE Cable diameter
DC
Cable length
Cable length
Mating connector
* The distance between inverter and PV array and back, plus the summarised length of the cables used for
PV array installation.
Table 5.5: Cable Requirements
Note:
Avoid power loss in cables of more than 1 % of nominal inverter rating.
Note:
In France, observe the UTE C 15-712-1 and NF C 15-100 requirements.
Specification
−25 °C - +60 °C (>45 °C derating)
IEC60721-3-3
3K6/3B3/3S3/3M2
ISA S71.04-1985
Level G2 (at 75 % RH)
1G
54
3000 m above sea level.
PELV protection is effective up to 2000 m above sea level only.
Avoid constant stream of water.
Avoid direct sunlight.
Ensure adequate air flow.
Mount on non-flammable surface.
Mount upright on vertical surface.
Prevent dust and ammonia gases.
Condition
Hole diameter
Alignment
Condition
5 wire cable
All 5 wires
2
2.5 mm
4 mm
2
6 mm
2
2
10 mm
4 mm
2
2
6 mm
10 mm
2
6 mm
2
2
10 mm
at least
4 mm
2
- 4.8 Ω /km
6 mm
2
- 3.4 Ω /km
Multi-contact
L00410309-07_02
5. Technical Data
Specification
30 x 9 mm
Perpendicular ± 5° all angles
Specification
Copper
18-25 mm
16 mm
21 m
34 m
52 m
87 m
28 m
41 m
69 m
34 m
59 m
as phase cables
Max. 1000 V, 12 A
< 200 m*