4. Start-up and Check of Settings

4. Start-up and Check of Settings
4.1. Start-up and Check of Settings
Note:
Due to the advanced functionalities of the inverter, it may take up to 10 seconds before the
4
display becomes available after power up.
Note:
For the TLX Pro version the first start-up and check of settings can also be performed via the
integrated Web Server. For further details, refer to the Web Server User Manual.
The inverter is shipped with a predefined set of settings for different grids. All grid specific limits
are stored in the inverter and must be selected at installation. It is always possible to see the
applied grid limits in the display. The inverter accounts for daylight saving automatically.
After installation, check all cables and then close the inverter.
Turn on AC at the mains switch.
When prompted by the display select language. This selection has no influence on the operating
parameters of the inverter and is not a grid code selection.
Illustration 4.1: Select Language
Note:
To use the default language (English) simply press the 'OK' button twice to select and ac-
cept.
18
The language is set to English at initial start-
up. To change this setting press the OK but-
ton. Press '
' to scroll down through the
languages. Select language by pressing 'OK'.