QUALIFIED
INSTALLER
Rough-in the 3" diameter vent liner into existing
chimney system being careful not to tear or damage
the liner in the process. Leave plenty of liner at the
bottom end if the heater will be connected while on the
Existing Fireplace
The size of the existing replace cavity will affect the
method of installation. Smaller replaces, particularly
factory-built zero-clearance replaces will require the
RF24 rebox to be disassembled then reassembled
inside the replace. Plan your particular installation
accordingly.
1. Unpack appliance.
2. Remove window.
3. Remove log pack from rebox.
4. Strip rebox down by removing:
a. Burner Module (4 screws),
b. Vent plate (2 screws);
c. Support Legs (2 screws per leg) (required
when inserting into small replaces only)
Spring-loaded
Fastening Studs (2)
Remove Window
18
Vent Liner Rough-in
Appliance Preparation
Remove
Burner
Module
(4 screws)
1/4 Turn
hearth—see diagram in Connection of liner to fi rebox
section. When connecting the liner in this manner, it is
best to leave the top termination until later so the
slack liner can be lifted after the insert is in place.
3" dia. Aluminum Liner
Rough-In Liner
Remove Vent Plate
Remove Window
Remove
Support Legs
(2 screws each)