Engine Mount Installation; Installing The Stopper Assembly - Seagull Models GEEBEE ARTF Instruction Manual

Plane
Table of Contents

Advertisement

GEEBEE.
CONTRONL HORN
.
M3 SCREW
.
ALUMINUM WASHER
.
ALUMINUM WASHER
Fuselage
.
16mm
.
Hinge.

ENGINE MOUNT INSTALLATION.

See pictures below.Make yourself the
template of your engine on paper.
3 x 25mm.
6
EPOXY.
.
M3 LOCK NUT
EPOXY.
Rudder
.
Rudder control horn.
Instruction Manual
4x30mm.
Mark and drill 4 holes for engine mount.
Insert 4 blind nuts to firewall.
3 x 25mm.

INSTALLING THE STOPPER ASSEMBLY.

1) Using a modeling knife, carefully cut
off the rear portion of one of the 3 nylon tubes
leaving 1/2" protruding from the rear of the
stopper. This will be the fuel pick up tube.
2) Using a modeling knife, cut one length
of silicon fuel line. Connect one end of the line
to the weighted fuel pick up and the other end
to the nylon pick up tube.(The silicon tube is
not included).
3) Carefully bend the second nylon tube
up at a 45º angle. This tube is the vent tube.
Thread locker glue.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Geebee

Table of Contents