Mounting The Engine; Installing The Battery - Seagull Models GEEBEE ARTF Instruction Manual

Plane
Table of Contents

Advertisement

GEEBEE.
Blow through one of the lines to ensure
the fuel lines have not become kinked in-
side the fuel tank compartment. Air should
flow through easily.

MOUNTING THE ENGINE.

1) Install the pushrod housing through the
predrilled hole in the firewall and into the servo
compartment. The pushrod housing should
protrude 1/4" out past the front of the firewall.
Make a Z-Bend 1/4" from one end of the plain
wire pushrod.
2) Place your engine onto the engine
mount. Adjust the engine is centered of the
edges of the engine case.
3) When you are satisfied with the align-
ment, mark the locations of the engine
mounting.
4) Remove the engine. Using an drill bit,
drill the mounting holes through the engine
mount at the four locations marked.
8
155mm
.
4.2 mm
diameter.
Instruction Manual
5) Bolt the engine to the engine mount using
the four machine screws. Double check that
all the screws are tight before proceeding.
6) Attach the Z-Bend in the pushrod wire to
the throttle arm on the carburetor.
Machine Screw 4x30mm.

INSTALLING THE BATTERY.

Battery tray.
Pushrod wire.
Epoxy.
Tie Wrap.
Battery.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Geebee

Table of Contents