Capacity Confirmation Of The Project Data Downloading Location - Mitsubishi GT16 User Manual

Hide thumbs Also See for GT16:
Table of Contents

Advertisement

POINT
POINT
POINT
Version confirmation of BootOS by rating plate
Confirm the version of BootOS installed in the GOT at product shipment by rating plate of GOT rear face.
GT1675M-VTBA
MAC ADD.
MITSUBISHI ELECTRIC CORPORATION
GT16-70VLTTA
6.1.3

Capacity confirmation of the project data downloading location

When download the project data, confirm the capacity of the user area in the drive to which transferred, the transferred
project data size, the transfer size and buffering area size of the optional function OS in advance to judge whether to
carry out the download.
The capacities can be confirmed by GT Designer3 or GT Designer2.
Refer to the following for details.
6 - 4
6.1 Data Storage Location
D
•GT Designer3 Version1 Screen Design Manual (Fundamentals)
(7.5.2 Drive capacity required for data transfer)
•GT Designer2 Version
(8.1.2 Drive capacity required for data transfer)
A A
BootOS version
(In case that the BootOS is two digits,
only the first digit is written.)
Basic Operation/Data Transfer Manual

Advertisement

Table of Contents
loading

Table of Contents