Final Tasks - Electra WNG 7 Service Manual

Wng led/lcd series
Table of Contents

Advertisement

9

FINAL TASKS

1. Replace all valve caps and ensure that they are tightened properly.
2. Fill gaps on the wall between hole sides and tubing with sealer.
3. Attach wiring and tubing to the wall with clamps where necessary.
4. Operate the air conditioner together with the customer and explain all functions.
5. Explain filter removal, cleaning and installation.
6. Give the operating and installation manuals to the customer.
CONTENT

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents