Deicing Procedure - Electra WNG 7 Service Manual

Wng led/lcd series
Table of Contents

Advertisement

Deicing procedure

o
OCT [
c]
12
0
DOC
DST
(DDT)
3 min
ON
COMP
OFF
DI (note 1)
ON
OFAN
OFF
ON
RV
OFF
ANY
L
IFAN
ON
HE
ANY
ANY
IFAN
OFF
ANY
HE
OFF
ON
OPER
BLINK
LED
Notes :
At the first COMP activation after SB or OFF, if (OCT < 0
min, else DI = 40 min.
In the following Deicing cycles, the time interval between two Deicing
cycles activation is between 30 to 80 min (refer to the flow chart).
For RC group, HEs are forced OFF. IFAN operation is as in Heat
Mode, Sect 4.0.3.a, i.e. IFAN will be set to OFF when ICT<30
For WAX, the IFAN is simply forced OFF.
For SH group, HEs are forced ON and IFAN is forced to operate in Low
speed, regardless of the ICT and difference between RAT & SPT.
Service Manual - WNG
36s
max 12 min.
30s
30s
DT
IFAN is forced to Low Speed
HEs are forced ON
Note 3
HEs are forced OFF
Revision Y05-03
CONTENT
CONTROL SYSTEM
3 min
36s
DI (note 2)
o
c), then DI = 10
o
c.
12-21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents