Installing The Load Cell Pcb-Temperature Sensor-Position Sensor - OHAUS PA64 Service Manual

Hide thumbs Also See for PA64:
Table of Contents

Advertisement

CHAPTER 3 MAINTENANCE PROCEDURES
3.3.33 Installing the Load Cell PCB-Temperature Sensor-Position Sensor Assembly
The Temperature Sensor, Position Sensor and the Load Cell PCB can be installed as an
assembly, as follows:
Load Cell PCB
Figure 3-154. Load Cell PCB, Temperature Sensor and Position Sensor.
1. Install the Load Cell PCB by
fitting the groove on the left of
the PCB into the tab on the Load
Cell frame. (See Figure 3-155.)
When screwing in, first turn the
self-tapping Cell Board Screw in
a counterclockwise direction
until the first screw thread
engages and then tighten it.
(See Figure 3-111, page 3-42.)
2. Gently hold PCB in position while inserting and tightening the screw that secures it.
3. Carefully position the
Temperature Sensor under the
Magnet, so the Temperature
Sensor (a very fine thermister
that extends from the board)
goes into the hole between the
three screws on the bottom of
the Magnet. (See Figure 3-156.)
4. Insert the screw to secure the
Temperature Sensor Board.
Ohaus Corporation www.ohaus.com
Position Sensor
Temperature
Sensor
Figure 3-155. Groove on left of PCB fits tab
Figure 3-156. Temperature Sensor
extends into a hole in the Magnet
Note: Do not adjust the screws around
the Temperature Sensor hole. It could
ruin the Load Cell.
3-52
on Load Cell frame.
Don't adjust
screws around
Temperature
Sensor hole!
Pioneer™ Balances Service Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents