Engine Reinstallation - HYOSUNG WOW90 Service Manual

Hyosung wow90
Table of Contents

Advertisement

3-5 ENGINE

ENGINE REINSTALLATION

F o r r e m o u n t i n g e n g i n e , r e v e r s e t h e o r d e r o f
engine removal and take the following additional
steps.
● Install the engine mounting link bolts.
(Refer to page 3-4)
Engine mounting link bolt
: 70 ~ 100 N∙m (7.0 ~ 10.0 kg∙m)
● Install 90ml of transmission oil SAE 10W/30 or
10W/40 multi-grade motor oil when engine is over-
hauled, check the oil level.
Transmission oil capacity
(when overhauling engine)
● Set the fuel cock to "ON"position and start the
engine.
● After remounting the engine, route wiring harness
and cables properly by referring to the sections,
wire routing and cable routing, and adjust the fol-
lowing items to the specification.
� Throttle cable
� Idling adjustment
� Front brake cable
� Rear brake cable
� Drive chain
90 ml
Refer to page 2- 6
Refer to page 2- 6
Refer to page 2- 7
Refer to page 2- 8
Refer to page 2-10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents