Installation and Operation Precautions
1.4
Space Requirements
To ensure that machine operation, consumables replenishing, part replace-
ment, and regular maintenance can easily be performed, adhere to the rec-
ommended space requirements detailed below.
64.5
(1637)
49.5
(1258)
45.3
(1150)
36.5
(928)
64.5
(1637)
53.1
(1350)
45.3
(1150)
bizhub 500/420 + PC-202 + FS-510 + SD-502 + LU-201
bizhub 500/420
3.9
19.2
(100)
(487)
23.2
(590)
64.5
(1637)
45.3
(1150)
46.3
(1177.8)
bizhub 500/420 + DK-501
20.9
23.2
(532)
(590)
12.6
(320)
17
(432)
63.3
(1609.8)
bizhub 500/420 + PC-202 + FS-510
25.7
26.7
(652)
(677)
15.6
(397)
20.8
(530)
25.3
(642)
79.5
(2019)
3.9
(100)
21.7
15.3
(550)
(387.8)
3.9
(100)
15.3
21.7
(387.8)
(550)
3.9
(100)
21.7
23.2
(550)
(590)
(1458)
Unit : Inch (mm)
7.8
(200)
27.9
(708)
57.4
(1458)
Unit : Inch (mm)
7.8
(200)
27.9
(708)
57.4
(1458)
Unit : Inch (mm)
7.8
(200)
27.9
(708)
57.4
1-15
1