The position and orientation of the inverter are very important. Install the inverter vertically and
securely with screws or bolts on a surface that is free from vibrations and that can bear the
inverter's weight. If the inverter is not installed vertically, its cooling performance may be
degraded and trip events or inverter damage may result. If the inverter requires an external DC
reactor, do not install the reactor directly under the inverter.
Air flow
Heated air
SJ700
Series inverter models -1850hFx2 to -4000hFx2are very heavy. For example, the
2
315kW inverter weighs about 463 lbs. (210kg). Therefore, be careful when loading and
transporting these inverters. Use the eyebolts on the inverter housing and frame to lift the
inverter. The diagrams below show different lifting configurations to fit the orientations you
may need.
Upright inverter lifting:
Use eyebolts at top of inverter
Eyebolts
Horizontal inverter lifting: Use eye-
bolts at front corners of inverter
SJ700
Inverter
2
Heated air
Eyebolts
Eyebolts
DC reactor lifting:
Use bolts at top of frame
2–7

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents