selected synchronisation shall be launched. Fig. 2 shows an example of
configuration for a one–month progress of updates.
Basic parameters
These parameters define how the action shall behave: its trigger and behaviour upon
start.
Action type – define the action trigger: either the logical input to
Button press
start day in
Action duration – set the action end.
Specific time – set the action duration using the following
Repeat n–times – define how many times the playlists selected in the Playlist
shall be played. Use the
Repeat all around – make playing never stop. This option is particularly
comfortable in connection with the HW button: press the button once to start the
action and repress it to stop the action.
Fade between two actions
Prefer to server – enable this parameter to interrupt the current playing from
the server whenever the action starts.
Use as default – define which action is the default one and must be checked off.
®
2N
TELEKOMUNIKACE a.s., www.2n.cz
Figure: Synchronisation Properties
) or a time value (
At time
Action planning
; refer to Subs. 6.1.3., Action Planning.
Repeat count
). If you select time, select the time value and
item.
®
2N
NetSpeaker
(
Duration in (s)
field.
43