Tower Setup - Avaya S9RM Installation And Operator's Manual

3000 va, 120v uninterruptible power systems
Table of Contents

Advertisement

NOTE The PDM must be installed above the UPS and the EBMs must be installed
below the UPS as shown in Figure 3.
5. Slide the UPS and any optional cabinets into the rack.
6. If installing optional EBMs, continue to "EBM Installation" on

Tower Setup

The UPS and any optional cabinets must be stabilized with pedestals
and/or joining brackets. The setup varies depending on the number of
cabinets you are installing:
1.
2. Place the UPS cabinet horizontally so that the left end of the
3. Position the pedestals over the end of the UPS cabinet so that
Avaya S9RM 3000 VA, 120V UPS Site Preparation, Installation and Operator's Manual
Optional
PDM
UPS
Optional
EBMs
Figure 3. Rack-Mount UPS with PDM and EBMs
page 23. Otherwise, continue to "Power Connections" on
page 25.
both sets of pedestals must be installed.
For one cabinet,
Complete Steps 2 through 4.
the pedestals and the joining brackets must be
For two cabinets,
installed. Skip to Step 5.
skip to Step 8 to install the joining
For three or more cabinets,
brackets.
unit is accessible (see Figure 4).
the weight of the unit is evenly distributed. Secure the pedestals
with the screws provided in the accessory kit.
:
700285596 Issue 1
Installation
19

Advertisement

Table of Contents
loading

Table of Contents