3.2.3
Rack Mounting the Enterasys Matrix N7 Chassis
The N7 chassis can be mounted in a standard 48.26-centimeter (19-inch) equipment rack. To rack
mount the chassis into a rack you need to
•
allow at least 60 centimeters (24 inches) of clearance in front of the rack for chassis installation,
•
install the shelf into the rack first, then
•
install the N7 chassis into the rack.
Note: In order to prevent a possible interference between the rack frame front and
chassis rack ears, the tapped rails may need to be adjusted such that they are recessed
approximately 2 inches behind the rack frame front. If the rack has a front door, this
distance may need to be slightly more depending on the door thickness.
Setting Up the Enterasys Matrix N7 Chassis
Enterasys Matrix N7 Chassis Setup