1
I
MOVING AND INSTALLATION
Seetion 2
2.3.4 Unpacking
After the machine has been properly positioned, remove the shipping bracket carefully
by screw driver and proper tools to avoid
being
hurt by the snails.
Unpack your machine carefully. Do not damage the machine surface paint.
rr
Be sure to retain this bracket
so
that it can be used again in the event that your
machine must be relocated.
2.3.5 Equipment Furnished
Your machine has a set of tools to do the maintenance as following,
1. Tool box
1 P C
2. Grease gun
1
PC
3. Screw drive(+,
-)
2
PCS
4. Open end spanner
3 pcs
5. Hexagon wrench
1 set
6. Chip filings spade (with manual type only)
1 PW
7. Operation
&
parts book
1 pcs
2.3.6 Installation Procedures
Your machine is more easy installing
than other brand's type. Following this manual,
you can do yourself step by step. The major
machine function for setting up as following:
fixing the machine on the floor, machine leveling,
installation of feed roller, cutting fluid supply,
I
hydraulic oil supply, electrical connection
1.
For best performance, the band saw has to be anchored on a solid foundation. The
ground foundatin must have a carrying capacity of approximately 2.0 ton (including:
material weight).
2.
It is recommended that the shock absorption pads be installed when levelling.
3.
If a crane is used to lift the machine, ensure that the lifting cable is the properly attached to
the machine.
rr
Be careful to protect the machine from impact or shock during this procedure. Machine
weight: 540 kg( 11881bs).