MOVING AND INSTALLATION
Section 2
B. CLEANING
After the machine has been spotted on the designated position, remove the rust-preventive
grease with wiping cloth dampened with cleaning oil or kerosene. Apply machine oil to the machine
surfaces that are susceptible to &sting.
u
Do not remove the rust-preventive grease with a scraper or the like. Do not wipe the painted
surfaces with solvent.
-
2.3 INSTALLATION OF THE MACHINE
2.3.1 Safety Precautions
Surroundings
J
Keep the machine away from the sun light.
J
Keep the temperature of the surroundings at
5 4 0 " .
J
Keep the humidity of the surrondings at
30%-95"
(without condensation) to
avoid dew on electric installation and machine.
J
Keep enough space between your machine and others machines to avoid the vibration
interfering to each other.
J
Do not install your machine on an uneven ground foundation.
-
J
Keep your machine away from the water or heavy dust.
Power Supply
J
Supply voltage:
90 %- 110 %
of nominal supply voltage.
J
Source frequency: 99
%- 101 %
of nominal fkquency.
J
Do not use the same power supply together with electric spark machining, electric welder.
to avoid unstable voltage.
J The independent and direct power supply is a suggestion.
J * Use correct capacity of electric power supply.
-Limit the supply voltage variations to within
+
10%
J* Earth the machine properly with an independent wire.
2.3.2 Initial Inspection
1.
Check the model of your machine and the instruction manual.
2. Check the equipment or tools being furnished.
3.
Check the outlook of your machine to make sure that your machine was shipped or
transportation in a good condition.
23.3 Space Required
Keep enough spaces for material loading and unloading, operation, inspection and
maintenance of the machine as the following figures,
.