Starting The Group 2 Test; Running The Group 3 Test; Assembling A Loopback Plug - 3Com 3C509B User Manual

10 mbps isa network interface card
Hide thumbs Also See for 3C509B:
Table of Contents

Advertisement

104
C
HAPTER
Figure 60 Assembling a Loopback Plug
50Ω
Terminator

Starting the Group 2 Test

Follow these steps to run the Group 2 test on either the
3C509B-TPC or 3C509B-COMBO NIC:
1 Connect the loopback plug to the round BNC
connector on the NIC.
2 Start the Configuration and Diagnostics Program,
as described in
Diagnostics
3 From the Test menu, select Test Setup.
4 Enable the Group 2 test. Select OK and press Enter.
5 Go to the Run Tests dialog box to start the tests.
6 After the test is completed:
a Exit the Configuration and Diagnostics Program.
b Remove the loopback plug.

Running the Group 3 Test

The Group 3 test is the Echo Exchange Test. It tests to see if
the NIC can transmit and receive data while connected to
the network. If you have successfully run the Group 1 and
Group 2 tests, a failure in the Group 3 test usually indicates
a cabling, hub, or network problem.
CAUTION: Do not use an active network to run the
Group 3 test.
7: T
ROUBLESHOOTING FOR
T connector
"Starting the DOS Configuration and
Program" on
W
3.
INDOWS
X
50Ω
Terminator
page
102.

Hide quick links:

Advertisement