Installation Locations; Site Preparation - Alcatel-Lucent 7450 ESS-1 Installation Manual

Ethernet service switch
Hide thumbs Also See for 7450 ESS-1:
Table of Contents

Advertisement

Installation Locations

The 7450 ESS-1 switch can be installed in either of the following:
7450 ESS-1
An equipment rack.
Rack mounted units can be front or center mounted in many types of racks, including the
following:
→ Standard 19-inch (48.26 cm) equipment rack
→ Standard telco rack (four-post)
Follow the equipment rack manufacturer's instructions for proper rack installation.
The equipment rack rail mounting holes must align with the mounting holes on the chassis
mounting brackets. The 7450 ESS-1 mounting brackets are factory installed for a front
mount in a 19-inch rack.
Required tools:
→ #2 Phillips screwdriver
→ Flathead screwdriver
→ Anti-static bags, mats, and packaging
→ ESD wrist strap
A stable flat surface.
Tabletop or shelves must be able to support the weight of the switch, or a stack of 7450
ESS-1 switches (up to 8 units high), and attached cables.
Required tools:
→ Anti-static bags, mats, and packaging
→ ESD wrist strap

Site Preparation

Page 29