Installation - Honda CB400T Shop Manual

Table of Contents

Advertisement

. .
HONDA
'81 ADDENDUM
C8400T/CM400T.A.E.C
INSTALLATION
Install the front forks.
CM400TlAlC:
Position the fork tube end 3 mm (0.12 in.)
from the upper surface of the fork top bridge.
C8400T:
Align the fork tube end with the upper sur-
face of the fork top bridge.
Tighten the fork pinch bolts.
TORQUE:
UPPER: 0.9-1.3
kg-m (7-9 ft-lb)
LOWER: 1.8-2.5 kg-m (13-18 ft-lbl
Tighten the fork tube caps.
TORQUE: 1.5-3.0 kg-m (1 1-22 ft-lb)
Apply grease to the new O-rings.
Place new O-rings on the air hose connectors.
Install the air hose to the right fork tube cap.
TORQUE: 0.4-0.7
kgm (3-5 ft-lb)
Date of Issue: December, 1980
O HONDA MOTOR CO., LTD.

Advertisement

Table of Contents
loading

Table of Contents