10. Use the SMW to download firmware to the new controller to match the version
11. Use the EMW to remove the RAID controller from the management domain,
12. View the storage subsystem profile and confirm that the NVSRAM and
13. Use the EMW to remove the RAID controller from the management domain.
14. Use the procedure described in "Turning off the storage server" on page 67 to
15. Reinstall each drive in the slot from which it was removed.
16. Power on the storage server, using the procedure described in "Turning on the
17. Use the EMW to add the RAID controller back into the management domain
18. Verify that the RAID controller is accessible.
19. Continue with 24 on page 101 in the RAID controller replacement procedure.

Replacing the battery in the RAID controller

Each RAID controller contains a rechargeable battery that maintains the data in the
cache memory for three days without power to the unit.
Important: If you are replacing the battery in a DS4100 single-controller storage
Use the following procedure if the DS4000 Storage Manager client instructs you to
replace the battery because the current battery has failed or is nearing its expiration
date. You can also use the DS4000 Storage Manager client to check the status of
the battery.
number shown in your storage subsystem profile. (Refer to your printout.) After
15-20 minutes, the SMW reports a download failure. Click OK to ignore the
error warning and instructions and proceed with the following step.
and again add the new controller using the IP address assigned to the new
controller by the IP server.
controller firmware versions match the versions shown in your storage
subsystem profile printout.
power off the storage server.
storage server" on page 66.
using the original IP address (refer to your printout).
server, complete the following steps before beginning the replacement
procedure:
1. Schedule down time for the battery replacement, because the disk
will not be available during the procedure.
2. Complete any necessary server preparation tasks.
3. Save the configuration storage subsystem profile.
Note: Before any planned system shutdown or after any system
additions, removals, or modifications (including logical drive
creations, storage partitioning definitions, hardware changes,
and so on), save the storage subsystem profile as explained
in the DS4000 Storage Manager guide for your operating
system. Save the profile in a location other than the logical
drives created for the DS4100 storage server.
4. Stop I/O to the storage server.
5. Unmount any mapped LUNs from the storage server.
6. Power down the DS4100 single-controller storage server, as
described in "Turning off the storage server" on page 67.
1. Check the DS4000 Storage Manager client online help for instructions on
battery replacement procedures. If you are using write-cache mirroring, this
Chapter 5. Installing and replacing components
105