Figure 76. Removing the controller battery
10. Remove the screw that holds the battery access panel. Carefully slide the
11. Remove the battery unit and place it on a dry, level surface. If this is a battery
12. Unpack the new RAID controller.
13. Place the replacement RAID controller CRU bottom up on a flat surface. Using
14. Slide the RAID controller bottom panel away from the front side of the RAID
15. Carefully flip over the RAID controller bottom panel.
16. Remove the screw that holds the battery access panel. Carefully slide the
17. If DHCP/BOOTP was used to automatically set the IP address of the controller,
18. Write the battery replacement information on the label on the battery pack.
100
IBM TotalStorage DS4100 Storage Server: Installation, User's, and Maintenance Guide
Battery
access panel toward the front to unlatch it from the three pins mounted on the
RAID controller bottom panel.
replacement, then replace the old battery with the new one and go to step 19
on page 101.
Set the RAID controller on a dry, level surface away from magnetic fields.
Save the packing material and documentation in case you need to return the
RAID controller.
a #2 Phillips head screwdriver, remove the six screws (three on each side of
the RAID controller) that hold the RAID controller bottom panel to the sides of
the RAID controller, as shown in Figure 75 on page 99.
controller (away from the SFP slots and black center latch) to unlatch it from
the side panels.
access panel toward the front to unlatch it from the three pins mounted on the
RAID controller bottom panel.
record the MAC address of the upgrade controller and modify the existing
DHCP/BOOTP record of the RAID controller to be upgraded with the new MAC
address. Failure to modify the DHCP/BOOTP record will result in problems
trying to manage the storage server using the existing IP address. This step
must be performed before you insert the upgrade controller into the DS4000
storage server.
v Installed date – Write today's date
Battery Harness
Two-Pin