Powerware BPIV Installation & Operation Manual page 215

10–15 kva/20–30 kva
Table of Contents

Advertisement

I/O
CABINET
P/O TB1
A
MAINS
IN
B
208V
C
GND
P/O
4- -POLE
GND BLK
P/O TB1
A
B
BYPASS
IN
208V
C
N
OPTIONAL
42 CIRCUIT
DISTRIBUTION
GND
L1
L2 L3
P/O TB1
A
2
AC LOADS
OUT
B
4
208/120V
OR
480V
C
6
W/O
DISTRIBUTION
N
P/O TB1
NEUTRAL TO
GND
GND BOND
P/O
4- -POLE
GND BLK
P/O = PART OF
CONFIGURATION
DUAL FEED; OUTPUT TRANSFORMER;
BYPASS SWITCH; WITH DISTRIBUTION
CONFIGURATION
SINGLE FEED; OUTPUT TRANSFORMER;
BYPASS SWITCH; WITH DISTRIBUTION
Powerware BPIV (10 kVA- -30 kVA) Installation and Operation
164201406 Rev. C 013004
OPTIONAL
N
X0
CB2
X21
OUTPUT
BREAKER
1
X22
N/C
3
X11
5
X12
N/C
150A
X31
X32
N/C
UPS SYSTEM OPTIONS CABINET CONFIGURATIONS
POWERWARE BPIV (20 kVA---30 kVA)
WITH ISOLATION TRANSFORMER
CONFIGURATION
DUAL FEED; OUTPUT TRANSFORMER;
BYPASS SWITCH; WITHOUT DISTRIBUTION
CONFIGURATION
SINGLE FEED; OUTPUT TRANSFORMER;
BYPASS SWITCH; WITHOUT DISTRIBUTION
CB3
BYPASS
BREAKER
1
2
3
4
5
6
150A
H2
H31
4
H3
8
H11
12
H1
H21
OUTPUT
XFMR
EXT. WRAP
BYPASS
DESCRIPTION:
OPTIONS CABINET SCHEMATICS
DRAWING NO:
164201406---7
REVISION:
C
INTER- -
CABINET
WIRING
GND
3
1
7
5
11
9
SW1
SHEET:
DATE:
013004
UPS
CABINET
MAINS
IN
A
E1
B
E2
C
E3
GND
BYPASS
IN
A
E6
B
E7
C
E8
N
E12
A
E9
B
E10
C
E11
N
E12
AC LOADS
OUT
13 of 18
A ---41

Advertisement

Table of Contents
loading

Table of Contents