Powerware BPIV Installation & Operation Manual page 205

10–15 kva/20–30 kva
Table of Contents

Advertisement

I/O
CABINET
P/O TB1
A
B
C
MAINS
IN
208V
GND
P/O TB1
4- -POLE
GND BLK
P/O TB1
A
B
C
N
BYPASS
IN
208/120V
OPTIONAL
42 CIRCUIT
DISTRIBUTION
AC LOADS
OUT
208/120V
A
B
P/O TB1
C
N
P/O TB1
P/O = PART OF
CONFIGURATION
DUAL FEED; BYPASS SWITCH;
WITH DISTRIBUTION
CONFIGURATION
SINGLE FEED; BYPASS SWITCH;
WITH DISTRIBUTION
Powerware BPIV (10 kVA- -30 kVA) Installation and Operation
164201406 Rev. C 013004
GND
N
L1
L2 L3
2
4
6
UPS SYSTEM OPTIONS CABINET CONFIGURATIONS
POWERWARE BPIV (10 kVA---15 kVA)
CONFIGURATION
DUAL FEED; BYPASS SWITCH;
WITHOUT DISTRIBUTION
CONFIGURATION
SINGLE FEED; BYPASS SWITCH;
WITHOUT DISTRIBUTION
OPTIONAL
CB3
BYPASS
BREAKER
1
2
3
4
5
6
70A
CB2
EXT. WRAP
OUTPUT
BYPASS
BREAKER
4
1
3
8
5
12
70A
DESCRIPTION:
DRAWING NO:
REVISION:
GND
3
1
7
5
11
9
SW1
OPTIONS CABINET SCHEMATICS
164201406---7
DATE:
013004
C
INTER- -
UPS
CABINET
CABINET
WIRING
A
E1
B
E2
C
E3
MAINS
IN
GND
A
E6
B
E7
C
E8
N
E12
BYPASS
IN
A
E9
B
E10
C
E11
N
E12
AC LOADS
OUT
SHEET:
3 of 18
A ---31

Advertisement

Table of Contents
loading

Table of Contents