10.2.2 Setting the ignition electrode
- Check the setting of the ignition electrode. Set the gap between the
ignition electrodes: 3 to 4 mm.
10.2.3 Checking the hydraulic pressure
The hydraulic pressure must be a minimum of:
- 0.3 bar for Gas 110 Eco 65,
- 0.5 bar for Gas 110 Eco 115.
10.2.4 Checking the ionization current
Check ionisation level, minimum 4 µA dc (ionisation measurement in
Volts between terminal 4 and earthing, 1 V dc
level < 2µA dc or not present, check:
- Is flame shape stable and colour as described in commissioning
instructions
- Check ignition probe earthing
- Check or replace ignition probe.
1
DHW sensor
2
Outdoor sensor / B2 (or high / low)
3
B1 (On/Off)
4
Modulating room control
≡
5
Measuring range V (
) (1 VDC = 1µA)
6
To terminal 4 of terminal strip
7
To earth clamp in instrument panel
25/01/2011 - 300014883-001-K
We recommend filling the installation to around 1.5 bars higher than
the static height.
≡
1µA dc). If ionisation
Gas 110 Eco 115 / 65
49