Chapter 4 System Start-Up Commissioning
Chapter 4 System Start-Up Commissioning
This chapter introduces the start-up commissioning of the chilled water AC, including preparation before
commissioning, commissioning procedures and inspection after commissioning.
4.1 Locating MCBs
The MCBs are located as shown in Figure 4-1, Figure 4-2 and Figure 4-3.
Figure 4-1 MCBs of one-bay series
Liebert.PEX Chilled Water Series Air Conditioner User Manual