Installing Line-Up-And-Match P1 And P2 Interface Connections - Eaton Powerware 9390 Installation And Operation Manual

Integrated distribution cabinet
Hide thumbs Also See for Powerware 9390:
Table of Contents

Advertisement

Installing the IDC
3.3.1.2 Installing Line-up-and-Match P1 Interface Connections
NOTE
IDC interface terminals, conduit must be installed between the the UPS cabinet or
device and the IDC, if wiring can not be run through line-up-and-match cabinets.
Install the control wiring in separate conduit from the power wiring.
1. Verify the UPS system is turned off and all power sources are removed. Refer to
2. If not already open, unfasten the front door latch and swing the doors open.
3. If not already removed, remove the doors. Remove the retaining screws located
4. If not already open, remove the screws securing the inside distribution panel
5. If not already removed, remove the screws securing the top internal safety shield
6. Route and connect the Maintenance Bypass switch wiring from the IDC to the UPS
7. To install the REPO IDC Maintenance Bypass switch shunt trip, remove the IDC top
8. Reinstall the conduit landing plate and install the conduit.
9. To locate the appropriate terminals, and for wiring and termination requirements,
10. Route and connect the wiring.
11. When all wiring is complete, reinstall the safety shield panels removed in previous
12. Close the inside distribution panel doors, and secure with screws.
13. Reinstall the doors removed in previous steps and secure with the retained
14. Close the door and secure the latch.
3-12
EATON Powerware
When installing control wiring (such as for shunt trip or aux contacts) to the
the Powerware 9390 UPS (100–160 kVA) Installation and Operation Manual for
shutdown instructions.
inside each door at the top and bottom hinge pivot points, then lift the door off.
Save the retaining screws for reinstallation of the doors.
doors, and swing the doors open.
panel, and remove the panel to gain access to the terminals.
cabinet. See Appendix A and refer to the Powerware 9390 UPS (100–160 kVA)
Installation and Operation Manual for UPS cabinet terminal locations.
or bottom conduit landing plate to drill or punch conduit holes (see Drawing
164201560-6 on page A-15).
see Drawing 164201560-8, starting on page A-23 and the Powerware 9390 UPS
(100–160 kVA) Installation and Operation Manual for UPS cabinet terminal
locations.
steps.
hardware.
9390 IDC Installation and Operation Manual S 164201560 Rev C www.powerware.com
®

Advertisement

Table of Contents
loading

Table of Contents