Hot Swapping Plm Devices - Lab.gruppen PLM series Operation Manual

Plm series powered loudspeaker management systems
Hide thumbs Also See for PLM series:
Table of Contents

Advertisement

7.
Read the onscreen warning message, tapping
8.
When all Processors have been updated, cycle the power of each PLM by turning the power switch off,
and then either removing the PowerCon connector from the rear of each PLM or switching off all power
to the PLM racks at source. Then reconnect the power and switch the PLMs back on. It is very important
to cycle the mains power in order for the firmware upgrade to take effect.
9.
If the new firmware includes upgrades for the amplifier, or the front panel functions, these upgrades will
be initialized automatically. Activity and progress will be indicated on the front panel. After an upgrade of
the amplifier firmware, the unit will reboot automatically.
10.
Wait for each Processor to re-sync following the power cycle.
11.
Tap OK to the warning message that advises that the backup file will be
PLMs with the data that was present prior to the upgrade process.

12.8 Hot Swapping PLM devices

Should it be necessary to swap one PLM device for another within a system it is very important to make
sure that the configuration of the replacement unit is identical to that of the unit that it replaces. It is possible
to achive this by using the Replace Frame facility within the Lake Controller software application. See Lake
Controller User Manual chapter 7.4.3 for further information.
Yes to proceed.
PLM Series Operation Manual rev 1.1.3
12. Application Guide
recalled. This file will reload the
101

Advertisement

Table of Contents
loading

This manual is also suitable for:

Plm 10000qPlm 14000

Table of Contents