Installing The Switch On A Table Or Desktop - Allied Telesis AT-FS713FC/xx Installation Manual

10/100 mbps ethernet switches
Table of Contents

Advertisement

Installing the Switch On a Table or Desktop

To wall-mount the switch, refer to "Wall-mounting the Switch" on page 16. To
install the switch on a table or desktop, perform the following procedure:
1.
Remove all components from the shipping package and store the
packaging material in a safe location.
Note
Do not remove the dust covers from the fiber optic port until you are
ready to connect the fiber optic cable. Dust contamination can adversely
impact the operating performance of the port and the switch.
2.
Attach the four protective feet (provided) to each corner of the base of the
unit.
3.
Connect the twisted pair cables to the RJ-45 connectors.
4.
Remove the dust cover from the fiber optic port and connect the fiber optic
cable to the port.
5.
Set the 100FX DUPLEX switch on the fiber optic port to either HALF for
half-duplex or FULL for full-duplex operation. The capabilities of the end-
node connected to the fiber optic port will determine the correct setting for
this switch. If the end-node is capable of only half-duplex, set the switch to
HALF. If the end-node is capable of full-duplex, set the switch to FULL.
Caution
Power cord is used as a disconnection device: To de-energize
equipment, disconnect the power cord. $ 10
6.
Power ON the switch by plugging one end of the power cord to the back of
the switch and the other end of the power cord to a power outlet. The PWR
LED should be green. If the LED is OFF, refer to "Troubleshooting" on
page 19 for assistance.
7.
Power ON the end-nodes connected to the ports on the switch.
8.
Check the LNK/ACT LED for each port. The LED should be green or
blinking. If the LED is OFF, refer to "Troubleshooting" on page 19 for
assistance.
The switch is now ready for use.
AT-FS713FC/xx and AT-FS717FC/xx Series Installation Guide
15

Advertisement

Table of Contents
loading

Table of Contents