Download  Print this page

Securing The Switching Unit - Miele CT 400 MP Operating And Installation Instructions

Built-in and mobile tepan
Hide thumbs

Advertisement

Securing the switching unit

^ Carefully place the stainless steel
tepan plate facedown on top of the
worktop, either to the left or right of
the cut-out.
This must be done carefully to
prevent damage to either the
worktop or the tepan plate.
^ Stick the sealing strip b supplied to
the edge of the tepan plate from
below (see illustration).
CT 400 P installation instructions
^ Place the switching unit in position,
as illustrated with its spindle and
indicator lights pressed from inside
into the drill holes made previously.
Secure the switching unit with the
Spax screws a supplied.
25

Advertisement

Table of Contents
loading

  Related Manuals for Miele CT 400 MP

This manual is also suitable for:

Ct 400 p