Introduction; Inspecting The Package And Product - GarrettCom Magnum 6K32F Installation And User Manual

Industrial managed switch
Hide thumbs Also See for Magnum 6K32F:
Table of Contents

Advertisement

Magnum 6K32F/FR/FC/FRC Managed Switch Installation and User Guide (05/08)
2.0

Introduction

2.1

Inspecting the Package and Product

Examine the shipping container for obvious damage prior to installing this
product; notify the carrier of any damage that you believe occurred during shipment or
delivery. Inspect the contents of this package for any signs of damage and ensure that
the items listed below are included.
This package should contain:
1
Magnum 6K32F, 6K32FR, 6K32FC or 6K32FRC Managed Switch, base
unit (configured with user-selected port module option in modular slot)
1
AC Power Cord (U.S. and other 115 VAC only)
1
Set of metal "Ears" for 19" rack mounting
1
Installation and User Guide (this manual)
Remove the items from the shipping container. Be sure to keep the shipping
container should you need to re-ship the unit at a later date.
In the event there are items missing or damaged, contact the party from whom
you purchased the product. If the unit needs to be returned, please use the original
shipping container if possible. Refer to Section 6, Troubleshooting, for specific return
procedures.
www GarrettCom com
.
.
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents