Step3 Processor installation:
1. Lift processor package from shipping media by grasping
the substrate edges. Scan the processor package gold pads
for any presence of foreign material. If necessary, the gold
pads can be wiped clean with a soft lint-free cloth and
isopropyl alcohol.
2. Scan the processor package gold pads for any presence
of foreign material. If necessary, the gold pads can be
wiped clean with a soft lint-free cloth and isopropyl
alcohol.
3. Locate connection 1 indicator on the processor which aligns
with connection 1 indicator chamfer on the socket, and notice
processor keying features that line up with posts along socket
walls.
Hardware Installation
SHB103 LAG1156 Full-Size SBC User's Manual
25
Need help?
Do you have a question about the SHB103 Series and is the answer not in the manual?
Questions and answers