Figure 23 General Arrangement, Water/Glycol Split Systems - Liebert Mini-Mate2 MMD24E User Manual

2 & 3 tons, 50 & 60hz
Hide thumbs Also See for Mini-Mate2 MMD24E:
Table of Contents

Advertisement

Figure 23 General arrangement, water/glycol split systems

Suction Line Male Quick
Connect Coupling
Suction Line Female Quick
Connect Coupling
Sensing Bulb
External Equalizer
Filter
Drier
Expansion
Valve
* Use Liebert sweat adapter kit with field
hard piping or use Liebert pre-charged line
set. Close-coupling option available with
MCD.
Evaporator Coil
** Components are not supplied by Liebert
but are recommended for proper circuit
operation and maintenance.
Scroll
Compressor
Liquid Injection
Valve Bulb
*
Liquid Injection
Valve
Service Access
Ports
Liquid Line
Male Quick
*
Connect
Liquid Line
Coupling
Female Quick
Connect
Coupling
High Pressure
Scroll Switch
Hot Gas
Bypass
Solenoid
Valve
Water/Glycol
Return Line
Fluid Return
From Unit
Fluid Supply
To Unit
Shutoff **
Valves
2 - Way Water
Hose Bibs **
Regulating Valve
FIELD PIPING
FACTORY PIPING
39
Site Preparation and Installation
Tube in Tube
Condenser
Tube in Tube
Condenser
Water/Glycol
Supply Line
Fluid
Return
From Unit
3 - Way Water
Fluid Supply
Regulating Valve
To Unit
(Optional)
DPN000190
REV 1
®
Liebert
Mini-Mate2

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading
Need help?

Need help?

Do you have a question about the Mini-Mate2 MMD24E and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF