Maintenance Inspection Checklist - Liebert Mini-Mate2 MMD24E User Manual

2 & 3 tons, 50 & 60hz
Hide thumbs Also See for Mini-Mate2 MMD24E:
Table of Contents

Advertisement

10.0 M
AINTENANCE
Date:
Model #:
NOTE
Reheat element sheaths and fins are manufactured with stainless steel. Regular inspections
are necessary to assure proper cleanliness of the reheating element. Should inspection reveal
corrosion particles on the reheating element or adjoining surfaces (including ducts and
plenums), appropriate cleaning should be performed. Periodic reheating element replacement
may be required to meet specific application requirements.
Monthly Inspection Items
Filters
___ 1. Check for restricted airflow.
___ 2. Check for filter.
___ 3. Wipe section clean.
Fan Section
___ 1. Impellers free of debris
___ 2. Bearings in good condition
Semiannually
Compressor Section
___ 1. Signs of oil leaks
___ 2. Vibration isolation.
Refrigeration
Cycle
___ 1. Suction pressure
___ 2. Head pressure
___ 3. Superheat
___ 4. Evaporator coil clean
___ 5. Insulation intact
Air-Cooled Condensing Unit (if
applicable)
___ 1. Condenser coil clean.
___ 2. Motor mount tight.
___ 3. Bearings in good condition.
___ 4. Refrigerant lines properly
supported.
Notes:_______________________________________________________________________________________
Signature:
Make photocopies of this form for your records
®
Liebert
Mini-Mate2
I
C
NSPECTION
HECKLIST
Prepared By:
Serial Number:
Humidifier
___ 1. Check canister for mineral deposits.
___ 2. Check condition of electrodes.
___ 3. All hoses and fittings tight.
___ 4. Check water make-up valve for leaks.
Drain Lines
___ 1.
Check for obstructions and sediment
build up.
___ 2. Check for external damage and/or
corrosion.
___ 3. Check for leaks.
Flood Back Head Pressure Control (if
applicable)
___ 1. Check refrigerant level.
Water or Glycol-Cooled Condensing
___ 1. Water valve adjustment.
___ 2. Water flow
___ 3. Water leaks
Glycol Pump (if applicable)
___ 1. Glycol leaks
___ 2. Pump operation
___ 3. Glycol solution
___ 4. pH level
Electric Panel
___ 1. Check electrical connections.
___ 2. Operational sequence
68

Maintenance Inspection Checklist

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents