IBM E16RMLL-I - Tivoli Storage Manager Implementation Manual page 644

Implementation guide
Table of Contents

Advertisement

If you elect to manually break the plan into its components, each stanza starts
with the keyword
name with the same name as the stanza. The file should contain all lines
between and including the
contents of the SERVER.REQUIREMENTS stanza. Your file should have that
name, and all of the contents shown in the example.
Example 19-24 DR plan stanza
begin SERVER.REQUIREMENTS
Database Requirements Summary:
Available Space (MB): 2,024
Assigned Capacity (MB): 2,024
Maximum Pct. Utilization: 25.1
Recovery Log Requirements Summary:
Available Space (MB): 1,712
Assigned Capacity (MB): 1,712
Maximum Pct. Utilization: 55.9
Server Installation Directory: C:\Program Files\Tivoli\tsm\
end SERVER.REQUIREMENTS
To use the sample script to break out a disaster recovery plan on Windows, use
the syntax shown in Example 19-25.
Example 19-25 Break out a DR plan on Windows
C:\tsmdata\drm\plans> cscript planexpl.vbs recoveryplanfilename
For AIX, the syntax is shown in Example 19-26.
Example 19-26 Break out a DR plan on AIX
root@Atlantic /tsm/drm/plans: awk -f planexpl.awk recoveryplanfilename
614
IBM Tivoli Storage Manager Implementation Guide
begin
and ends with the keyword
begin
Pct. Utilization: 25.1
Physical Volumes: 3
Pct. Utilization: 0.0
Physical Volumes: 7
end
. You should create a file
end
and
keywords. Example 19-24 shows the

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tivoli storage manager

Table of Contents