Operations Checklist - IBM E16RMLL-I - Tivoli Storage Manager Implementation Manual

Implementation guide
Table of Contents

Advertisement

Tasks
Install the client code.
Update the environment.
Update client options files.
Start backup-archive client.
Implement scheduler.
Implement Web client.

1.2.3 Operations checklist

The operations checklist consists of those tasks you should complete on a daily
basis. The tasks contained in the checklist are shown in Table 1-6. Each task in
the table has a reference to another section in this book. Each section referred to
contains the specific details on how to complete that task. This checklist does not
include the tasks we recommend scheduling on a daily basis. See Chapter 13,
"Routine tasks" on page 395, for more information about scheduled operations.
Table 1-6 Daily operations checklist
Tasks
Check completion of client and administrative events.
Bring free off-site volumes back to onsite.
Send copy tapes to off-site location.
Send Tivoli Storage Manager database copy to off-site.
Check database and log utilization.
12
IBM Tivoli Storage Manager Implementation Guide
Refer to
4.2, "Code installation" on
page 101
"Environment variables" on
page 113
"Options file" on page 114
"Starting a session" on
page 172
4.7, "Client scheduler" on
page 173
"Web client" on page 183
Refer to
13.6.2, "Client-server
activity" on page 421
13.7.5, "Off-site tape
management to on-site" on
page 439
13.7.3, "On-site and
off-site tape management"
on page 430
13.7.8, "Database backup
management" on
page 442
13.6, "Daily sanity checks"
on page 414

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tivoli storage manager

Table of Contents