HP 10000 G2 Series Installation Manual page 99

Rack options
Hide thumbs Also See for HP 10000 G2 Series:
Table of Contents

Advertisement

Insert one M5.5 self-tapping screw into each bottom corner of the assembly (3).
c.
Repeat steps a through c for the other side panel.
d.
Assemble the upper duct.
2.
Align the hooks of the side panels with the slots of the front and back panels (1).
a.
Slide the six hooks into the slots, and then slide the panel down until it locks in place (2).
b.
From the inside of the assembly, insert two M6 cap screws in the middle of the assembly. Using an
c.
adjustable wrench, secure the screws from outside the assembly with an M6 star washer, an M6 flat
washer, and a nut (3).
Repeat steps a through c for the other side panel.
d.
Install the draw-latch straps to the upper duct assembly.
3.
Slide the draw-latch strap around the bottom of the upper duct assembly (1).
a.
Align the holes of the draw-latch strap with the holes of the upper duct assembly.
b.
Rack Air Duct kit 99

Advertisement

Table of Contents
loading

Table of Contents