HP 10000 G2 Series Installation Manual page 65

Rack options
Hide thumbs Also See for HP 10000 G2 Series:
Table of Contents

Advertisement

Place an M8 internal serrated lock washer and an M8 hex nut over the grounding strap on the rack top
3.
and tighten.
From the grounding lug on the rack top to the grounding lug on the perforated panel:
Place one end of a 36.83-cm (14.5-in) grounding strap over the same grounding strap on the rack top.
1.
Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the rack top
2.
and tighten.
Place the other end of the same grounding strap over the grounding lug on the perforated panel.
3.
Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the perforated
4.
panel and tighten.
From the grounding lug on the perforated panel or fan kit to the grounding lug on the egress slot:
Place one end of a 15.24-cm (6-in) grounding strap over the grounding lug on the perforated panel or
1.
fan kit.
Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the perforated
2.
panel or fan kit and tighten.
Ground Bonding kit 65

Advertisement

Table of Contents
loading

Table of Contents