HP 10000 G2 Series Installation Manual page 56

Rack options
Hide thumbs Also See for HP 10000 G2 Series:
Table of Contents

Advertisement

Repeat steps 1 through 4 for the other bottom side panel.
5.
From the middle system chassis rail to the middle side panel:
Connect a 36.83-cm (14.5-in) and a 15.24-cm (6-in) grounding strap with connectors together.
1.
Insert a T-25 Torx screw through the end of the 36.83-cm (14.5-in) grounding strap, and secure it to the
2.
middle system chassis rail.
Place the end of the 15.24 (6-in) grounding strap over the grounding lug on the middle side panel.
3.
Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the middle
4.
side panel and tighten.
Repeat steps 1 through 4 for the other middle side panel.
5.
From the middle system chassis rail to the top side panel:
Connect a 36.83-cm (14.5-in) and a 15.24-cm (6-in) grounding strap with connectors together.
1.
Insert a T-25 Torx screw through the end of a 36.83-cm (14.5-in) grounding strap, and secure it to the
2.
middle system chassis rail.
Ground Bonding kit 56

Advertisement

Table of Contents
loading

Table of Contents