Adaptec Snap Server 700i Series User Manual page 201

For adaptec ontarget powered snap servers
Hide thumbs Also See for Snap Server 700i Series:
Table of Contents

Advertisement

SANbloc S50 Hardware Checklist
The following checklist shows the required and optional hardware to install an S50 ,
and indicates whether a component comes with the server or must be supplied by
the customer.
Component
Description
Connection
SAS Cable (1 per enclosure)
and Power
Required to connect the expansion array to the host Snap Server 700i
Series.
Power Cables (2 per enclosure)
Required to plug into the mains.
APC-Brand UPS Device(s) (optional)
The S50 should be connected to the same UPS as the Snap Server to
which it is attached.
Rack
Rack Mount Brackets
Two (2) rack mount shelves and screws for attaching the server to a
rack.
S50 expansion arrays are designed for use with EIA-compliant 4-post
racks.
Snap Server and Expansion Array Hardware Checklists
EIA-Compliant Rack
Appendix C Your Snap Server 700i Series
195

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Snap Server 700i Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents