Snap Server and Expansion Array Hardware Checklists
Snap Server 730i and 750i Hardware Checklist
The following checklist shows the required and optional hardware to install a Snap
Server 730i or 750i, and indicates whether a component comes with the server or
must be supplied by the customer.
Componen
t
Network and
Power
Rack
Expansion
194
Snap Server 700i Series User's Guide
Description
Ethernet Cables (4 per enclosure)
Required to connect the Ethernet port(s) to the network.
Power Cables (6 per enclosure)
Required to plug into the mains (2 US, 2 UK, 2 EU).
Ethernet Switches
Use switches that support GbE.
APC-Brand UPS Device(s) (optional)
Snap Servers are designed to work with a USB-based or network-based
APC-brand UPS. Visit the
models.
Slide Rail Assemblies (2 per enclosure)
Two (2) slide rails and screws for attaching the server to a rack.
32 inch/36 inch, Four-post Rack
You must use a 32-inch (or greater) four-post rack to mount this server.
SAS Card
Required to connect to an S50 expansion array.
APC Web site
for a listing of optimal APC