3.
Observe the power CPU LED (not shown), located on the front panel. During the
initialization, the CPU LED will start by illuminating solid amber, then start blinking
green, then blinking amber, then blinking green again until the end of the
initialization, and then turns solid green.
Note: If the CPU LED illuminates solid red, there was a critical failure. For more
information about the LED indications and troubleshooting, refer to
additional help, contact Enterasys Networks. Refer to
details
If the switch is a standalone switch, it will take approximately 30 seconds for the
switch to start up. If the switch is a stack Manager, it can take up to 3 minutes or more
to start up, depending on the number of Member switches in the stack.
C2RPS-PoE Redundant Power System
If you are installing an optional redundant power system (C2RPS‐POE), refer to the
installation instructions supplied with the SecureStack C2RPS‐POE. The switch is
connected to a C2RPS‐POE using a C2RPS‐POE Cable.
Figure 3-7
1
RPS coverplate
2
Retaining screws to fasten plate
.
Accessing the RPS connector
Á
Á
"Getting
Â
Â
À
3
Screw holes for coverplate
SecureStack A2 PoE Installation Guide
Connecting AC and PoE Power
Chapter
4. If you need
Help" on page 1-7 for
3-13
Need help?
Do you have a question about the Enterasys SecureStack A2 A2H124-24P and is the answer not in the manual?
Questions and answers