System Screen - Test And Debug; Cold-Start Nvram "Zip"Test And Debug Screen - Zhone IMA CS-200 System Reference Manual

Imacs-200 series
Table of Contents

Advertisement

System Configuration and Operation
.
Once here, enter 'Z' to zip the system, and the screen seen in Figure 3-9 will appear.
Figure 3-9.Cold-Start NVRAM "Zip"Test and Debug Screen.
Confirming the "Z" command will start the ZIP process. "Zipping" the system deletes all of
the information stored on NVRAM and resets it. All ports must then be completely
reconfigured. When the zip is performed, user names and password data will be maintained.
System Operation
Figure 3-8.System Screen - Test and Debug.
WARNING!
Reinitializing the System
3-13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents