Post-Installation Instructions - Acer AT350 F2 Series Service Manual

4u dual socket rack-mountable tower server
Hide thumbs Also See for AT350 F2 Series:
Table of Contents

Advertisement

5
Open the server according to the instructions on page 41.
6
Follow the ESD precautions described in the previous section when
handling a server component.

Post-installation instructions

Perform the steps below after installing a server component.
1
See to it that all components are installed according to the described
step-by-step instructions.
2
Reinstall any expansion board(s), peripheral(s), bracket(s) and system
cable(s) that have previously been removed.
3
Reinstall the side panel.
4
Reconnect the power, peripheral, and telecommunication cables.
5
Turn on the system.
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents