Opening The Server; Removing And Installing The Side Panel - Acer AT350 F2 Series Service Manual

4u dual socket rack-mountable tower server
Hide thumbs Also See for AT350 F2 Series:
Table of Contents

Advertisement

28

Opening the server

Caution: Before you proceed, make sure that you have turned off the
system and all peripherals connected to it. Read the Pre-installation
instructions section on page 26.
You need to open the server before you can install upgrade components.
The left side panel is removable to allow access to the server's internal
components. Refer to the following sections for instructions.

Removing and installing the side panel

Removing the side panel
1
Observe the ESD precautions described on page 26.
2
Observe the pre-installation instructions described on page 26.
3
Remove the two screws (1) on the rear edge of the side panel.
4
Press the latch handle to unlock (2) and pull the handle to slide and
disengage the side panel (3).
5
Lift the panel away from the server (4).
3 System upgrades

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents