Installing The Operation Panel; Installing The Cotton Stand - Brother RH-9820 Instruction Manual

Electronic eyelet button holer
Hide thumbs Also See for RH-9820:
Table of Contents

Advertisement

3. INSTALLATION

3-8. Installing the operation panel

0355B

3-9. Installing the cotton stand

Operator
13
0356B
Install the cotton stand so that it is at the far left of the table
when looking from the front of the sewing machine.
*
Do not use the thread guide (1) which is provided a an
accessory with the cotton stand.
(2) Cotton stand
(3) Washer
(4) Nut
NOTE:
Tighten the nut to secure the cotton stand firmly so that it
will not move.
The cotton stand can also be installed on the far right side
of the table, but if this is done, the threading method will
change. (Refer to "4-5. Threading the thread when the
cotton stand is installed on the right side".)
0357B
RH-9820
(1) Operation panel
(2) Screws [4 pcs.]
1. Pass the cord of the operation
panel (1) through the table hole.
2. Loosen the two screws (3) at the
rear of the control box, open the
cord presser plate (4) in the
direction of the arrow, and pass the
cord through the hole into the box.
(Refer to "3-1. Table processing
diagram"
for
details
installation
position
operation panel.)
NOTE:
Check that the operation panel cord
is
not
being
clamped
screwing the operation panel into
the table. The cord may become
damaged if it is clamped.
on
the
for
the
when

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents